Thermal design, BMS architecture, the five quality gates every unit passes, and the standards we hold on our storage lines — plus what sits with you as the economic operator under EU 2023/1542.

Thermal

3 K cell-to-cell. Stated with its conditions.

Cell-to-cell temperature spread is held within 3 K at 35 °C ambient under 0.5 C continuous operation, on the liquid-cooled cabinet. Temperature spread is what drives the weakest cell, and the weakest cell is what ends the pack — not the average.

The figure is quoted with the ambient and the C-rate attached, because a spread number without them means nothing. Ask any supplier for the conditions before you compare.

BMS

Protocols your SCADA already speaks.

CAN, RS485, RS232, SMBus, I²C, Bluetooth, GPS and 4G across the range. System-level cabinets expose Modbus TCP and IEC 104; rack modules expose Modbus RTU for gateway integration.

The BMS communication protocol document ships with the unit — not as a support ticket three weeks after commissioning.

Quality gates

Five checks between the cell and the container.

Applied to every unit before despatch, with the record filed against the serial number.

Cell matching

Voltage spread ≤ 5 mV, internal-resistance spread ≤ 0.2 mΩ. Capacity measured, not declared.

Weld validation

First-article pull test, metallurgical inspection, in-line CCD detection.

Insulation and function

100 % hipot at 1,000–2,000 V; BMS communication and every protection path tested.

Ageing

Multi-point, multi-cycle at 1 C with continuous voltage and temperature monitoring.

Transport simulation

Low pressure, thermal shock, vibration, short circuit — then final inspection for appearance, function, polarity and serial label.

Standards

What is held on our storage lines.

LayerStandardStatus
CellIEC 62619 · UL 1973Held
SystemIEC 63056 · IEC 62477-1Held
System — fireUL 9540ABy test on request
GridEN 50549-1 / -2Held
EMCEN 61000-6-2 / -6-4Held
TransportUN 38.3 · Class 9Held
Quality systemISO 9001 · ISO 14001Held

Anything not yet in the file is quoted with a test lead time before contract — we would rather tell you the date than discover it at the FAT.

Country requirements

Grid and fire safety, by destination.

Site-specific requirements are mapped in the technical annex for each project, not assumed from the country of destination.

CountryGrid connectionStorage and fire safety
GermanyVDE-AR-N 4105 (LV) / 4110 (MV); Anlagenzertifikat and Einheitenzertifikat, registered in ZEREZVDE-AR-E 2510-2 for stationary storage; state building-code fire rules
NetherlandsEN 50549-1; NEN 4010 and NEN 1010 for the LV installationPGS 37-1 and PGS 37-2 for lithium-ion storage; regional fire-service (brandweer) notification
FranceNF C 15-100; Enedis connection rules and the applicable arrêtéUTE C 15-712-3 for storage installations; SDIS consultation
ItalyCEI 0-21 (LV) / CEI 0-16 (MV)CEI 0-21 storage annex; VVF fire-service opinion
SpainRD 244/2019; RD 1699/2011; NTSRSCIEI and CTE DB-SI
PolandPrawo energetyczne; IRiESD; PN-EN 50549-1/-2Building and site fire-protection regulation (MSWiA)
EU market entry

The file we build with you.

Under Battery Regulation (EU) 2023/1542, the carbon-footprint declaration, recycled content, due diligence and the battery passport sit with the economic operator placing the unit on the market.

We supply the inputs we hold — chemistry, mass balance, test reports, unique identifiers — and state in writing what you must source elsewhere. That sentence is worth having before a tender, not after.

Transport and insurance

UN 38.3 test summary, Class 9 documentation, MSDS, sea-worthy packing and a container loading plan issued with every shipment, prepared for the forwarder you nominate.

Site-fit data

Floor area, overall height, clearances, cable entry and lifting points are issued per model as a dimensioned drawing, with the acoustic level at 1 m and the heat rejection the HVAC design needs.

Tell us the duty cycle. We will send the datasheet.

Voltage window, energy, power and C-rate, duty profile, installation environment, destination country. That is enough for a first proposal.