OEM / ODM energy storage · Shenzhen, China info@plmen-batteries.com
Home/Downloads

Documents you can request before committing

Some of these are public. Others we only release against a signed NDA or a live project — not because they are secret, but because a test report for the wrong configuration is worse than no report at all.

Company

  • Company registration
  • Manufacturing authorisation letter
  • ISO 9001 / ISO 14001 certificates
  • Bank and trade references

Product

  • Datasheet per model
  • Dimensioned drawing and terminal layout
  • BMS communication protocol
  • Installation and O&M manual

Compliance

  • UN 38.3 transport test summary
  • Factory test report, serial-numbered
  • Certificate of conformity
  • IEC 62619 / UL 1973 · IEC 63056
  • UL 9540A — by test on request
Project documents

What arrives with the unit.

FAT protocol and the signed FAT record, packing list, sea-worthy packaging specification, spare-fuse and connector kit, and the warranty statement — 10-year performance, 5-year product.

The serial-numbered unit built for your order is photographed at FAT, and those photographs are issued with the test record. You approve the actual hardware before it is packed.

Request the file

Tell us which model family and which country the project is in. We send the datasheet and drawing set for that family, and flag anything that needs a test lead time.

Tell us the duty cycle. We will send the datasheet.

Voltage window, energy, power and C-rate, duty profile, installation environment, destination country. That is enough for a first proposal.